Project Plan - Status of elements

Status of elements:

 

Red (for elements that were classified in the template as high risk):

The confirmed date is later than the requested date, or the sample was not completed by the requested date. Start date is not considered at the traffic light calculation.

 

Orange (for elements that were classified in the template as low risk):

The confirmed date is later than the requested date, or the sample was not completed by the requested date. Start date is not considered at the traffic light calculation.

Depending on your customer's configuration, it may also be that some elements change to the Orange status before the actual target date. This affects critical elements for which a pre-warning time of x days is set with your customer. You will find more on this under the customer-specific information on this page.

 

Green:

The confirmed date is earlier than the requested date, or the sample was completed by the requested date, or a requested date was not entered and the sample was completed.

 

Gray (empty):

The status display remains empty if the element has been classified as "No risk". The traffic light status can only be set manually.

Completion degree (%):If the sample is closed, this field becomes automatically 100%. If tasks are assigned to the particular element, the completion degree is calculated as the ratio of the closed tasks to all tasks.

Automatic status display:

The most negative status of all elements within the phase is automatically displayed at the level of a phase.

The most negative status of all phases within the project is automatically displayed at the level of a project.

 

 

 

 

Further possible questions:

 

  • What does the chain displayed next to requested dates mean?
    The chain symbol indicates that a requested date is present for this element in the program. Hovering over the symbol with the mouse shows you the requested date from the program. This symbol is only shown to users of the buying company.

     

  • What does the grey status next to traffic light mean?
    The grey status means that a status report was generated in the past.
    The symbols circle (=green), triangle (=yellow), or square (=red) indicate which status was set while generating the status report.

     

  • What does the gray exclamation mark symbol (!) displayed next to requested dates mean?
    The gray exclamation mark symbol is shown if there is a requested date for this element in the program and no entry has been made yet in the project.
    To take the requested date over from the program for the whole project, please click on the button "Transfer requested dates from -program-" below. This symbol is only shown to users of the buying company. 

     

  • What does the green exclamation mark symbol (!) displayed next to attachments of elements mean?
    The green exclamation mark symbol shows that an attachment (or a version of an attachment) has been added or deleted since your last login.

     

  • What does the yellow warning symbol displayed next to requested dates mean?
    The yellow warning symbol shows if the requested date of an element in the program is earlier than the stated requested date of the project. This symbol is only shown to users of the buying company.
Was this article helpful?
Why wasn't this article helpful?

To contact the Support-Team please click here

  • SupplyOn Start
    • Training
    • Media Library
    • Supplier Cockpit
    • Update company data
    • What is a notification, what is a discussion?
    • Notifications
    • Discussions
    • Adding recipients to a discussion
    • Contact the Support Team
  • User Management
    • Change of the user administrator
    • Change user master data
    • User account creation
    • Add user roles
    • User ID and Password rules
    • Change user id
    • Resetting a password for a user
    • Confirm requested user roles
    • Lock or delete a user account
    • Unlock a user account
    • Customer Responsibles
    • Set up a substitute
    • Specify a successor
    • Standard Settings
    • Definition: supplier contact - main contact - user
  • Login Problems
    • Two-factor authentication - tips and tricks for securely logging in
    • Two-factor authentication - recommended authenticators
    • Two-factor authentication - problems with the one-time password?
    • Who is my user administrator?
    • Locked account?
    • User ID forgotten?
    • Password forgotten?
    • I need more user rights
    • Wrong e-mail address in user account
    • Access without user ID / registration
  • SupplyOn Services
    • Logistics Settings
      • Creating a new Control Point
      • Change an existing Control Point
      • Assign users to a Contol Point
      • Download and Upload Format Descriptions
      • Deposit/Change Commercial Register Number
    • Supply Chain Collaboration
      • Dashboard: Functions
      • E-Mail Notifications - what are the options?
      • E-Mail notification settings
      • Alert settings and notifications
      • Adjust view and set up search profiles
      • Error 'This page is not available to you'
      • Creation and update of article master data
      • Upload and download of article master data
      • Assigning customer articles to a supplier article
      • Download delivery instructions
      • Delivery Instructions: Adjusting the cumulative quantity
      • Delivery Instructions: Demand History
      • Orders: History of an order
      • Orders: Possibilities of order confirmation
      • ASN: Change of filter settings for open demands
      • ASN: Automatic ASN number assignment
      • ASN: Label number assignment within ASN
      • ASN: How to adjust the gross weight during the ASN creation
      • ASN: One-level vs. mulitilevel packaging
      • ASN: Download XML template for ASN
      • ASN: How to delete an ASN
      • Connecting Suppliers (guideline for buyers)
      • Updating ASN profiles (for buyers)
      • FPA: General information
      • FPA: Delete or cancel a FPA
    • EDI
      • EDI connection via SupplyOn
      • Which buying companies are using the interface via SupplyOn?
    • VMI
      • Process Keys
      • Create an ASN from VMI
      • VMI Outbound Messages
    • eInvoicing
      • Invoice Upload via CSV or XLSX
    • AirSupply
      • How to create e-mail notifications in AirSupply
      • How to change supplier material number and description
      • Format Descriptions for H2M and M2M
      • Open downloaded file in Excel
      • PO: Supplier comment and supplier acknowledgement number
      • PO: Decline an order
      • PO: Price not visible
      • PO: supplier comment cannot be edited
      • PO: Purchase Order cannot be modified by a buyer user
      • eInvoicing: Processing status of an invoice
      • eInvoicing: Missing payment of an invoice
      • Conbid User Guide
      • POEMA: Change of contact persons for PO e-mail access suppliers for Airbus
      • POEMA: How can I see all e-mail access POs that I received?
    • Business Directory
      • Business Directory - How to
      • Certificate Management
      • Who can see which information?
      • Central administration for multiple plants
      • Upload product catalogue
    • Sourcing
      • End date of RfQ has expired
      • Missing attachments
      • Declining a RfQ after a bid has been submitted
      • E-Mail notification when a RfQ is withdrawn
      • RfQ cannot be found (customer)
    • Document Management
      • Process Overview
      • E-Mail notifications
      • Different dates and their meaning
      • Response Status
      • Hierarchical view
      • Globally provided documents
      • Deleted documents
      • Status 'accepted with agreement'
      • User cannot see and access documents
      • Document package cannot get accepted
      • Locked document within document package
    • Performance Monitor
      • Process Overview
      • E-Mail notifications
      • Traffic light - the different symbols and their meaning
      • Display of the customer plants
      • Display previous months' supplier ratings
      • Access to complaints via Performance Monitor
      • Content-related questions about supplier ratings
      • Send an inquiry to the customer
    • Project Management
      • Customer Responsible Setting (Key Accounts)
      • Project Team - general information
      • Project Management (Continental): Project team - roles and authorizations
      • Project Management (Deutz): Project team - roles and authorizations
      • Project Management (Yazaki): Project team - roles and authorizations
      • Project Management (ZF): Project team - roles and authorizations
      • Email notifications
      • Search and search profiles
      • Project Plan - Status of elements
      • Change Log
      • Limited access to attachments
      • Project not visible in 'My projects'
      • Project Status (Customer)
      • Transforming an internal project to an external project (customer)
    • Problem Solver
      • Process Description
      • E-Mail notifications
      • Problem Solver Permissions – Customer Responsible vs. Team Member
      • Types of Response
      • Status of complaints
      • Task list
      • Complaints list
      • Search and Filtering Functions
      • Complaint details
      • Column 'position' in D1 team
      • Severity of a Complaint
      • Reject complaint
      • Referencing an 8D report
      • Status of actions and root causes
      • Edit actions and root causes
      • Submit options (for suppliers)
      • Automatic Timeout
      • Removing non-registered users from Team List
      • 8D report evaluation (for suppliers)
      • Upload or download 8D report in XML format
      • Interface for Problem Solver
    • Action Management
      • General information
      • Process overview
      • Email notifications
      • Topics
      • Action plans - general information
      • Action plans - from creation through to closure
    • eISIR
      • eISIR: General Information
      • zip.sec documents cannot be opened
    • EMS
      • Info Portal
      • Process Overview
      • Access to EFS (Empties Fee Settlement)
      • Open bookings sorting
    • Flexible Survey
      • SupplyOn Surveys - increase the quality of your supplier master data free of charge
      • Flexible Survey: Options for Surveys
      • Flexible Survey: FAQs
    • Visibility & Analytics
      • Download Reports
      • Use Bookmarks
      • Set up a schedule-based report transmission via email
      • Filter Reports
      • mobile App - iOS
      • mobile App - Android
  • eMail-Access
  • Technical information
    • Support Access functionality for error analysis
    • Technical requirements for the use of the platform
    • Clearing Cache and delete Cookies
    • Disable pop-up blocker for SupplyOn
    • Fix performance problems
    • SupplyOn Security and Certificates
    • Recommendation: Deactivate automatic translator in browser
    • Display error "white page"

Footer Topcases EN

  • Training and video tutorials
  • Career

Footer EN

  • Contact
  • Imprint
  • Legal notes
  • Privacy policy
  • Security/Certificates

© SupplyOn AG